Front End Engineering Design (FEED) Study for Bulk Storage Facility Expansion
| Project Duration: |
February 2008 - July 2008 |
| Project Features: |
FEED Study for Bulk Storage Facility expansion. |
| Works Included: |
Provision of Consulting and Engineering services for the development of a Front End Engineering Design (FEED) study for the expansion of Terminals’ Bulk Storage Facility at Port Botany. |
Project Outline:
Synertec was contracted to provide consulting, design, project management and engineering services to develop the FEED study.
Synertec provided personnel and expertise in order to:
- Finalise deliverables of the FEED study.
- Generate tank datasheets for tender purposes.
- Generate piping and instrumentation diagrams (P&IDs) showing project specific pipe runs and the associated instrumentation.
- Calculate pipe run lengths and valving/fittings/ instrumentation requirements for quotations.
- Develop a User Requirements Specification (URS) detailing all of the project process requirements, and functional and design constraints.
- Obtain quotations for the supply, installation and modification of a number of different pieces of equipment and pipework.
- Obtain quotations for civil engineering works, modifications to the dock line and other works packages.
- Provide a FEED report detailing the cost estimate and findings to be used as a basis for detailed design.
- Facilitate and document meetings and communication between stakeholders.
Find out more information about Synertec's bulk fuel installations.