Medical Developments International, Melbourne, Australia

New Manufacturing Facility

Project Duration: August 2000 to November 2002
Project Features: Development of SOP’s, Class 100,000 clean rooms, Instrumentation Laboratories, Office Fit-out, Process heat/cool systems, Fume cupboards, Hazardous area risk reduction strategies, Instrumentation gases, Hazardous goods storage, Negotiation with EPA & other statutory bodies
Project Outline: A facility for the scale up and manufacture of a liquid pharmaceutical

 

Project Outline:

  • The CSIRO was contracted by the Client to develop a novel synthesis for the manufacture of an inhaled pharmaceutical treatment. A bench scale process was developed that produced product that exceeded all the requirements of the United States Pharmacopoeia.
  • Synertec was contracted by the Client to work with CSIRO during this phase primarily as an advisor for the development of the process to ensure that what was being undertaken on the bench could be scaled up to a commercial process with minimal safety and regulatory hurdles.
  • Once the basis for the process had been established, Synertec undertook a detailed Front End Engineering Design (FEED) exercise. The exercise involved investigating all the issues surrounding the design, construction, validation and operation of a pharmaceutical manufacturing facility.
  • Synertec was contracted to deliver the project on a Lump Sum Turn Key (LSTK) basis. This included all aspects typical of a construction project but additionally required an extensive consultation process with local residents including community meetings and information sessions
  • Refined and upscaled the manufacturing process.
  • Designed and built the GMP manufacturing facility.
  • Wrote all control and data acquisition software to GMP and 21CFR Part 11 requirements.
  • Conducted supplier audits.
  • Wrote all facility SOP’s and Batch Process Sheets.
  • Qualified all process equipment.
  • Validated the manufacturing process.
  • Responsible for gaining TGA GMP licence.
  • Registered the product on behalf of the client.
  • On going manufacturing support.

« BACK

 

Latest News

Dr. Nick Kotlarski presented at GMP Asia Conference 2010
24-Feb-2010

Dr Nick Kotlarski, Principle Consultant, Biopharmaceuticals from Synertec Asia Pte Ltd presented..

Jon Reich presented “Qualification of IT infrastructure - How much is too much?” at ISPE Conference
15-Sep-2009

Download the presentation here (presentation.html) It is important for Life Science companie..