New Manufacturing Facility and Laboratories
| Project Duration: |
February 2006 - May 2006 |
| Project Features: |
Sterile Manufacturing & QC Laboratories, RO water system, WFI water system, Reticulated services, Dust containment |
| Works Included: |
A facility design project involving QC laboratories, GMP manufacturing facilities and warehousing. |
Project Outline:
- Synertec was contracted to undertake a Front End Engineering Design (FEED) study. The study included:
- Equipment selection
- Process and personnel flows
- Manufacturing facility layouts
- QC and microbiological laboratory layouts
- Wall and floor finishes
- Environmental control initiatives, including cascading pressure regimes and HVAC
- Critical elevation development
- Solid and Trade Waste disposal
- Town Planning considerations