Central Queensland Port Authority, Gladstone, QLD, Australia

Safety Instrument System Audit of Coal Ship Loader

Project Duration: 2007-2008
Site: The Port of Gladstone is one of the world's top five coal export ports, handling in excess of 38 million tonnes of coal per annum. Coal is the port's largest trade, representing over 70% of the total cargo exported through the port. R G Tanna Coal Terminal (RGTCT) consists of three shiploaders and handles 40Mtpa.
Works Included: The client brief was to provide an audit of the installed Safety Instrumented System (SIS) on Ship Loader no 3. From the audit results a practical way forward to bring the Shiploader and in particular the SIS up to appropriate standards was developed and implementation assistance was provided.

 

Project Outline:

The implementation of the control system and the SIS on shiploader no 3 had already been designed and implemented by the time SYNERTEC was engaged.

The design included multiple Risk Assessments, Safety Audits and HAZOPs. Functional descriptions, drawings and other design documents were available together with the PLC and PILZ code.

The first step was a thorough analysis of the documentation provided to produce a cross reference of those risks that were to be reduced by the SIS and also produce a list for confirmation of those risks that had other methods of protection such as guarding. A gap analysis of the requirements and known implementation was performed and rectification of missing system initiated.

The second step was to audit the implemented system to ensure that the designed system met the safety requirements of the HAZOP/Risk Assessments. This was to ensure, for example, that systems deemed to require Category 4 rating had been designed and implemented to Category 4 requirements.

This audit covered the entire loop from:

  • Field Sensor / Actuator
  • Field Cabling
  • Safety PLC
  • Safety PLC logic
  • On-going Maintenance procedures

The last step in the audit was to go through the testing/commissioning records to determine if correct testing had been performed on the system.

A GAP analysis for all of the above steps was undertaken to determine what additional work needed to be performed to ensure that the safety system met appropriate Australian Standards. In particular AS 4024 Safety of Machinery and AS61508 Functional Safety of Electrical\Programmable Electronic Safety Related System.

 

« BACK

 

Latest News

Synertec plays part in Victoria’s water future
27-Oct-2011

27th October 2011 Synertec is proud to announce the completion of the Maryborough Wate..

Synertec features in the Oil & Gas Financial Journal
22-Aug-2011

Synertec's success on being awarded provider of the QCLNG project's Packaged Analyser System by Bech..


Synertec's Managing Director interviewed by Focus Reports
28-Jun-2011

Synertec’s Managing Director, Michael Carroll was interviewed by Focus Reports in the wake of ..


Synertec features in The Australian Oil & Gas Review
14-Jun-2011

Synertec's specialist Online Analyser Capabilities have earned a feature on Page 18 of the June edit..